Toilleten Sitz
- Jinen/Jinjiekun
- Stadt Xiamen, China
- 30 Tage
- 50 Sätze pro Monat
1. Wir verwenden Kunststoff zur Herstellung von Toilettensitzen.
2. Vom Kunden entworfene LOGO-Muster können bereitgestellt werden.
3. Farbe: kann angepasst werden
4. Kundenspezifisches Erscheinungsbild: akzeptiert
5.Service: OEM oder ODM
6. Probe: Verfügbar
7. Mustergebühr: Käufer müssen eine Expressgebühr zahlen
8. Musterlieferzeit: innerhalb von 15 Tagen
9. Zahlungsmethode: 30 % Vorauszahlung per T/T, der Restbetrag wird vor dem Versand bezahlt
10. Produktionszeit: 20-45 Tage
11. Lieferhafen: Xiamen
Attention Plz:
Could U please offer the following information when you send us the mould inquiry?
a) product drawing or the sample photo with sizes.
b) mould steel you want to use.
c) runner system you want(cold or hot)
Number | Information | Answer |
1 | Quota | Customer should offer detail products picture or 3D design or samples. |
2 | Get Order | Communicate with customer for mould material,cavity,runner etc. |
3 | Mold design software | Ug,Proe,Solidwork,CAD |
4 | Mold Material | C55,P20,718,2316,H13,2738,S136 |
5 | Processing machine | CNC,Elaboration,EDM,Drilling machine,Injection machine. |
6 | Runner | Hot runne,Cold Runner |
7 | Mold Life | 500000 shots to 3000000 shots. |
8 | Cavity | Single or Multi |
9 | Delivery time | Usually 45 days |
Number Information Answer
1 Quota Customer should offer detail products picture or 3D design or samples.
2 Get Order Communicate with customer for mould material,cavity,runner etc.
3 Mold design software Ug,Proe,Solidwork,CAD
4 Mold Material C55,P20,718,2316,H13,2738,S136
5 Processing machine CNC,Elaboration,EDM,Drilling machine,Injection machine.
6 Runner Hot runne,Cold Runner
7 Mold Life 500000 shots to 3000000 shots.
8 Cavity Single or Multi
9 Delivery time Usually 45 daysOur Service
1.Mould Material Q/C
a) mould steel checking (hardness,flaw detection)
b) mould spare parts checking (hardness,size)
2.Mould Making Process Q/C
a) design checking ( product design,mould design,mould)
b) mould size checking (according to drawing)
c) mould testing (check mould working,sample)
How to reach our company xiamen?
1.From xiamen by bus 1 hour.
2.From Shanghai by train 8hours.
3.From Guangzhou by air 2 hours.
Welcome To Visit Our Company and Inquiry Us! Customer Demand is Our ongoing motivation!